Creek St

Date

2013

Type

Commercial Design & Build 

Client

Private 

A full design and build project constructed in two stages with the underground carpark and 4 units on top completed first and the other 4 units completed a year later.

The existing ground conditions gave us a challanage as the site was once used as concrete plants dumping ground for its excess concrete. This bulk concrete was broken up, crushed and recycled for hardfill to be reused under the foundations and floor slabs. Due to the height of the walls and the location of the building next to the southern motorway, we determined that precast panels posed too much of a danger of falling over in high winds during construction so masonry was chosen as the safest substitute. This also allowed us to complete areas in sections making the construction more convenient.

 

Construction activities include:

  • Project planning and management.
  • Council liaisons

  • Bulk site excavations and demolition

  • External Drainage

  • Extensive concrete foundations

  • Blockwork design and install

  • Steel works

  • Long run roofing

  • Internal warehouse/office fit-outs